{"id":1189,"date":"2026-11-05T08:00:00","date_gmt":"2026-11-05T08:00:00","guid":{"rendered":"https:\/\/dfdl.cc\/?p=1189"},"modified":"2026-11-05T08:00:00","modified_gmt":"2026-11-05T08:00:00","slug":"xl-21-commissioning-boundaries-procurement-guide","status":"publish","type":"post","link":"https:\/\/dfdl.cc\/it\/xl-21-commissioning-boundaries-procurement-guide\/","title":{"rendered":"XL-21 Distribution Cabinet: Commissioning Boundaries Procurement Guide"},"content":{"rendered":"<div class=\"wp-block-rank-math-toc-block\" id=\"rank-math-toc\"><h2>Table of Contents<\/h2><nav><ul><li class=\"\"><a href=\"#1-define-the-commissioning-boundaries-decision\">1. Define the commissioning boundaries decision<\/a><\/li><li class=\"\"><a href=\"#2-check-the-xl-21-configuration-boundary\">2. Check the XL-21 configuration boundary<\/a><\/li><li class=\"\"><a href=\"#3-commissioning-boundaries\">3. Commissioning Boundaries<\/a><\/li><li class=\"\"><a href=\"#4-test-evidence-and-configuration-traceability\">4. Test Evidence and Configuration Traceability<\/a><\/li><li class=\"\"><a href=\"#5-protection-settings-register\">5. Protection Settings Register<\/a><\/li><li class=\"\"><a href=\"#6-drawing-revision-control\">6. Drawing Revision Control<\/a><\/li><li class=\"\"><a href=\"#7-assembly-verification-scope\">7. Assembly Verification Scope<\/a><\/li><li class=\"\"><a href=\"#8-short-circuit-duty\">8. Short-Circuit Duty<\/a><\/li><li class=\"\"><a href=\"#9-compare-the-proposal-with-the-required-evidence\">9. Compare the proposal with the required evidence<\/a><\/li><li class=\"\"><a href=\"#10-work-through-a-project-review-before-release\">10. Work through a project review before release<\/a><\/li><li class=\"\"><a href=\"#11-prepare-the-inquiry-and-acceptance-package\">11. Prepare the inquiry and acceptance package<\/a><\/li><li class=\"\"><a href=\"#12-request-a-configuration-review\">12. Request a configuration review<\/a><\/li><li class=\"\"><a href=\"#frequently-asked-questions\">Frequently asked questions<\/a><\/li><\/ul><\/nav><\/div>\n\n\n<p class=\"wp-block-paragraph\">An XL-21 distribution cabinet proposal needs a clear answer to one purchasing question: how will the project separate factory checks from site acceptance responsibilities? The answer should connect the XL-21 distribution cabinet to its operating duty, installation interfaces and acceptance records. Selecting a familiar series or comparing a headline price leaves these details unresolved.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This guide examines commissioning boundaries for a commercial building refurbishment. Use the review sequence to prepare the technical inquiry, compare offers and identify the information required before manufacturing release. The worked review below is a planning illustration, not a report of a completed Dongfang customer project.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"800\" height=\"800\" src=\"https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/XL-21-Type-Power-Distribution-Cabinet.jpg\" alt=\"XL-21 Distribution Cabinet product view for XL-21 configuration review\" class=\"wp-image-739\" srcset=\"https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/XL-21-Type-Power-Distribution-Cabinet.jpg 800w, https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/XL-21-Type-Power-Distribution-Cabinet-300x300.jpg 300w, https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/XL-21-Type-Power-Distribution-Cabinet-150x150.jpg 150w, https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/XL-21-Type-Power-Distribution-Cabinet-768x768.jpg 768w, https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/XL-21-Type-Power-Distribution-Cabinet-600x600.jpg 600w, https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/XL-21-Type-Power-Distribution-Cabinet-100x100.jpg 100w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"1-define-the-commissioning-boundaries-decision\">1. Define the commissioning boundaries decision<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For the XL-21 distribution cabinet, the immediate objective is to separate factory checks from site acceptance responsibilities. Write that objective into the inquiry and identify the person who owns the engineering decision. Purchasing needs an approved technical basis before it can judge whether different offers describe the same scope.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In a commercial building refurbishment, begin with the circuit survey and the occupied-building work constraints. Tenants and fit-out requirements are changing while parts of the building remain occupied. Reconcile the existing circuit identifiers with the new drawings and establish which services must remain available. The installation plan needs temporary arrangements and a clear handover between existing and replacement equipment.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A useful review connects three records: the system requirement, the offered XL-21 distribution cabinet configuration and the evidence needed for acceptance. Mark an unknown value as unresolved and assign an action. A plausible number copied from a different model is less useful than a clearly identified question.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"2-check-the-xl-21-configuration-boundary\">2. Check the XL-21 configuration boundary<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The XL-21 family is presented as power distribution cabinet equipment. Obtain the final incoming and outgoing scheme, component schedule and enclosure arrangement for the proposed duty. A family designation should remain separate from the project-specific declaration of ratings.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Use the load and feeder schedule to define the cabinet configuration. Review cable preparation space and the maintenance plan before fixing the enclosure dimensions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A cabinet proposal needs a defined incoming arrangement, outgoing functions and system duty. Fixed distribution, integrated outdoor metering and reactive power functions should be compared by their purpose. Cabinet dimensions and a busbar current alone cannot establish a complete electrical configuration.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Review the <a href=\"https:\/\/dfdl.cc\/it\/prodotto\/xl-21-type-power-distribution-cabinet\/\">XL-21 Tipo Cabinet di distribuzione di energia<\/a> product entry alongside the <a href=\"https:\/\/dfdl.cc\/it\/categoria-prodotto\/power-distribution-cabinet\/\">Power Distribution Cabinet category<\/a>. Confirm the final offered configuration in controlled drawings and a technical schedule. Use GGD, XL-21 and JP product pages to identify the relevant family. For JP equipment, distinguish the integrated functions actually ordered from optional metering, protection and compensation provisions.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"3-commissioning-boundaries\">3. Commissioning Boundaries<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For the XL-21 distribution cabinet review, the design team should separate factory checks from site acceptance responsibilities. Commissioning depends on the completed installation and the approved system design. Create a responsibility matrix covering the XL-21 distribution cabinet supplier, installer, commissioning team and asset owner. Separate checks that can be completed in the factory from those that depend on site cables, earthing, protection settings or external control systems.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Agree the required records and acceptance criteria before delivery. Each result should identify the XL-21 distribution cabinet, instrument or method where relevant, drawing revision and person responsible. Unresolved defects need a disposition and a clear effect on readiness. Qualified personnel should follow the approved de-energization, isolation and testing procedure. Do not interpret a factory pass as permission to energize an incomplete site installation. Handover is stronger when the final records can be traced directly to the equipment identifiers in the asset register. Keep this point linked to the XL-21 distribution cabinet configuration and its approved interface documents.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"4-test-evidence-and-configuration-traceability\">4. Test Evidence and Configuration Traceability<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For the XL-21 distribution cabinet review, the design team should request evidence that corresponds to the XL-21 distribution cabinet supplied. Test evidence needs an identifiable scope. Ask which product, construction, rating and revision the document covers and how it relates to the proposed equipment. Distinguish design verification, routine checks, component evidence and site acceptance records. They answer different questions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Create an evidence schedule with document references and the requirement each document supports. A certificate title or laboratory logo does not establish every performance claim made in a quotation. Where the supplied configuration differs from the tested design, request the manufacturer&#x27;s explanation of the applicable verification route. Keep unresolved differences visible until reviewed. The purchase and handover files should make the connection between the XL-21 distribution cabinet, its declared characteristics and the supporting evidence clear enough for a later technical reviewer to follow without relying on sales correspondence. Keep this point linked to the XL-21 distribution cabinet configuration and its approved interface documents.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"5-protection-settings-register\">5. Protection Settings Register<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For the XL-21 distribution cabinet review, the XL-21 distribution cabinet design team should preserve the approved values and the reasons for them. A settings register should identify each protective device, its location, the approved values and the design revision. Record who approved the settings and what study supports them. Device model, firmware and available setting ranges can matter when equipment is substituted.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Keep the register linked to the single-line diagram and circuit identifiers. Define how factory settings, commissioning changes and later operational changes will be controlled. Qualified personnel should implement and verify settings under the approved procedure. A photographed dial position or copied spreadsheet is incomplete without the device identity and revision context. At handover, retain both the approved register and the verification record. This gives the owner a basis for diagnosing unwanted trips and prevents a replacement device from silently reverting to a different protective behavior. Keep this point linked to the XL-21 distribution cabinet configuration and its approved interface documents.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"6-drawing-revision-control\">6. Drawing Revision Control<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For the XL-21 distribution cabinet review, the XL-21 distribution cabinet design team should keep manufacture aligned with the latest approved design. Drawing approval should have a defined purpose and a controlled revision trail. State which drawings require review and which interfaces the project team must confirm. Keep the single-line diagram, general arrangement, terminal schedule and bill of materials consistent. Approval of one drawing should not be assumed to approve an unstated change elsewhere.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Create a change register that identifies the reason, technical effect, commercial effect and release decision. When the selected cable, protective device or control scheme changes, review the affected interfaces together. The supplier should know which revision authorizes manufacture. After completion, reconcile the final drawings with the supplied equipment and record any site changes. A folder containing several versions is not a controlled handover unless the operating team can identify the current approved documents. Keep this point linked to the XL-21 distribution cabinet configuration and its approved interface documents.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"7-assembly-verification-scope\">7. Assembly Verification Scope<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For the XL-21 distribution cabinet review, the design team should separate component ratings from complete-assembly characteristics. An assembly combines devices, conductors, supports, barriers and an enclosure. Its characteristics depend on that complete arrangement. Component compliance can support the design, but it does not automatically establish the rating or verification of the finished assembly.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Request the manufacturer&#x27;s declared assembly characteristics and the applicable verification evidence. Identify the relevant standard and edition in the purchase specification. Where a catalogue cites an older standard, ask how the proposed supply will meet the project&#x27;s current requirement. Changes to device family, conductor arrangement, enclosure dimensions or ventilation can affect the assessment. The technical comparison should show the proposed XL-21 distribution cabinet configuration and its limitations. This keeps the purchasing decision tied to equipment-level evidence rather than a collection of unrelated component certificates. Keep this point linked to the XL-21 distribution cabinet configuration and its approved interface documents.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"8-short-circuit-duty\">8. Short-Circuit Duty<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For the XL-21 distribution cabinet review, the design team should compare fault magnitude and duration with equipment capability. The available fault current is a system result. It depends on the source, transformer, cable paths and contributions from other equipment. Record the study location and the operating arrangement, because a future transformer or parallel source can alter the result. Distinguish the protective device&#x27;s breaking capability from an assembly&#x27;s short-time and peak withstand characteristics.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ask the designer to match both the fault magnitude and the clearing time with the relevant equipment evidence. A current value without a duration is incomplete where short-time withstand is involved. A device rating also does not prove the complete assembly&#x27;s capability. Keep any conditional rating tied to the specified upstream protective device and its settings. The procurement comparison should show the study requirement, the declared capability and any restriction together so that substitutions can be evaluated before manufacture. Keep this point linked to the XL-21 distribution cabinet configuration and its approved interface documents.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img decoding=\"async\" width=\"800\" height=\"600\" src=\"https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/Power-distribution-cabinet.jpg\" alt=\"Power Distribution Cabinet range illustrating alternative equipment layouts\" class=\"wp-image-217\" srcset=\"https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/Power-distribution-cabinet.jpg 800w, https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/Power-distribution-cabinet-300x225.jpg 300w, https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/Power-distribution-cabinet-768x576.jpg 768w, https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/Power-distribution-cabinet-600x450.jpg 600w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"9-compare-the-proposal-with-the-required-evidence\">9. Compare the proposal with the required evidence<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Build the comparison around commissioning boundaries, then check the related interfaces. For XL-21 distribution cabinet, the relevant boundaries include transformer or incoming supply; busbar and protective devices; outgoing cables; metering or compensation; foundation, room layout and maintenance access. Put the requirement and supplier response in adjacent columns so that differences are visible before purchase.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pay particular attention to an outgoing-feeder addition that exceeds the original thermal or source assumptions. Require the approved single-line diagram, general arrangement, declared assembly characteristics and configuration-specific verification. If a supplier proposes an alternative, ask which drawings, ratings, accessories and acceptance steps change. The commercial saving should be evaluated with those effects included.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Review item<\/th><th>Incomplete basis<\/th><th>Useful approval evidence<\/th><\/tr><\/thead><tbody><tr><td>Commissioning Boundaries<\/td><td>A product-family name or an unchecked assumption<\/td><td>A documented basis to separate factory checks from site acceptance responsibilities<\/td><\/tr><tr><td>Operating duty<\/td><td>A headline current or voltage without context<\/td><td>A duty schedule covering the approved operating cases<\/td><\/tr><tr><td>Interfaces<\/td><td>Symbols without cable, control or civil details<\/td><td>transformer or incoming supply; busbar and protective devices; outgoing cables; metering or compensation; foundation, room layout and maintenance access<\/td><\/tr><tr><td>Verification<\/td><td>Unrelated certificates or a similar product demonstration<\/td><td>the approved single-line diagram, general arrangement, declared assembly characteristics and configuration-specific verification<\/td><\/tr><tr><td>Change control<\/td><td>An email substitution with no impact review<\/td><td>An approved revision and identified consequences<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"10-work-through-a-project-review-before-release\">10. Work through a project review before release<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Consider a commercial building refurbishment purchasing XL-21 distribution cabinet. The buyer receives two offers that appear to cover the same requirement. Offer A identifies the proposed XL-21 distribution cabinet configuration and supplies the supporting interface schedule. Offer B lists a broad series name and leaves the assumptions open. These are illustrative offers, with no invented prices or performance results.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The first review action is to establish the circuit survey and the occupied-building work constraints. The second is to ask both bidders how they will separate factory checks from site acceptance responsibilities. Use the same technical questions for both offers. Any difference in test evidence and configuration traceability or protection settings register should be referred to the responsible designer rather than resolved by choosing the lower commercial total.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Before approving the XL-21 distribution cabinet order, close the unresolved interface questions and record the selected configuration. Identify what remains dependent on site work and who will verify it. If the requirement changes, reopen the affected assessment. This creates a practical release decision that the receiving and commissioning teams can understand.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"11-prepare-the-inquiry-and-acceptance-package\">11. Prepare the inquiry and acceptance package<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Send the system diagram, load or feeder information, installation conditions and the specific commissioning boundaries requirement with the inquiry. For XL-21 distribution cabinet, also include the relevant cable or control interfaces and the documents required at handover. State quantities and delivery destination separately from the technical duty.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Dongfang\u2019s <a href=\"https:\/\/dfdl.cc\/it\/solutions\/low-voltage-distribution-control\/\">Power Distribution Cabinet solution support<\/a> can be used as a starting point for discussing the configuration. Ask for a written response that identifies the proposed supply, deviations, evidence and project responsibilities. Final equipment selection should follow the responsible project designer\u2019s assessment.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For the applicable product-standard context, consult the <a href=\"https:\/\/webstore.iec.ch\/en\/publication\/32338\" target=\"_blank\" rel=\"noopener\">IEC low-voltage assembly verification scope<\/a> and specify the required part and edition with the project team. The reference explains the relevant standard family; it does not certify a particular Dongfang configuration.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"12-request-a-configuration-review\">12. Request a configuration review<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">To discuss commissioning boundaries for your XL-21 distribution cabinet, <a href=\"https:\/\/dfdl.cc\/it\/contact-us\/\">send Dongfang Electric Power your project requirements<\/a>. Include the circuit survey and the occupied-building work constraints, the XL-21 distribution cabinet schedule and the unresolved interface questions. Request a configuration-specific technical offer and an evidence list for review before purchase.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"frequently-asked-questions\">Frequently asked questions<\/h2>\n\n\n<div id=\"rank-math-faq\" class=\"rank-math-block\">\n<div class=\"rank-math-list\">\n<div id=\"faq-015-1\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">What information is needed to review commissioning boundaries for the XL-21 distribution cabinet?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Provide the circuit survey and the occupied-building work constraints, the approved system diagram and the relevant operating conditions. The review should establish how to separate factory checks from site acceptance responsibilities, then confirm the offered configuration and the acceptance evidence.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-015-2\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Does the XL-21 product name establish every required rating?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>No. Use the load and feeder schedule to define the cabinet configuration. Review cable preparation space and the maintenance plan before fixing the enclosure dimensions. The supplied XL-21 distribution cabinet needs a controlled technical schedule tied to the actual configuration. A catalogue range or keyword does not confirm every optional function.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-015-3\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Which interfaces need checking before ordering the XL-21 distribution cabinet?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Review transformer or incoming supply; busbar and protective devices; outgoing cables; metering or compensation; foundation, room layout and maintenance access. Assign responsibility for each boundary and keep the supplier response aligned with the approved drawings. Unresolved interfaces should remain visible in the review register.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-015-4\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">How should alternative XL-21 distribution cabinet offers be compared?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Use the same requirement schedule and ask each bidder for deviations, scope boundaries and evidence. For this decision, compare commissioning boundaries with test evidence and configuration traceability and protection settings register so that a price difference does not hide a configuration difference.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-015-5\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">What records should accompany the XL-21 distribution cabinet handover?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Retain the approved single-line diagram, general arrangement, declared assembly characteristics and configuration-specific verification, the final drawings, asset identifiers and applicable operating information. Keep factory verification distinct from site acceptance and close open technical items through documented review.<\/p>\n\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n\n<div class='fluentform ff-default fluentform_wrapper_3 ffs_default_wrap'><form data-form_id=\"3\" id=\"fluentform_3\" class=\"frm-fluent-form fluent_form_3 ff-el-form-top ff_form_instance_3_1 ff-form-loading ffs_default\" data-form_instance=\"ff_form_instance_3_1\" method=\"POST\" action=\"\" ><fieldset  style=\"border: none!important;margin: 0!important;padding: 0!important;background-color: transparent!important;box-shadow: none!important;outline: none!important; min-inline-size: 100%;\">\n                    <legend class=\"ff_screen_reader_title\" style=\"display: block; margin: 0!important;padding: 0!important;height: 0!important;text-indent: -999999px;width: 0!important;overflow:hidden;\">Richiesta sito web<\/legend>        <div\n                style=\"display: none!important; position: absolute!important; transform: translateX(1000%)!important;\"\n                class=\"ff-el-group ff-hpsf-container\"\n        >\n            <div class=\"ff-el-input--label asterisk-right\">\n                <label for=\"ff_3_item_sf\" aria-label=\"Newsletter\">\n                    Newsletter                <\/label>\n            <\/div>\n            <div class=\"ff-el-input--content\">\n                <input type=\"text\"\n                       name=\"item_3__fluent_sf\"\n                       class=\"ff-el-form-control\"\n                       id=\"ff_3_item_sf\"\n                \/>\n            <\/div>\n        <\/div>\n        <input type='hidden' name='__fluent_form_embded_post_id' value='1189' \/><input type=\"hidden\" id=\"_fluentform_3_fluentformnonce\" name=\"_fluentform_3_fluentformnonce\" value=\"9d8d15b745\" \/><input type=\"hidden\" name=\"_wp_http_referer\" value=\"\/it\/wp-json\/wp\/v2\/posts\/1189\" \/><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_3_input_text' id='label_ff_3_input_text' aria-label=\"Nome\">Nome<\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"input_text\" class=\"ff-el-form-control\" placeholder=\"Nome\" data-name=\"input_text\" id=\"ff_3_input_text\"  aria-invalid=\"false\" aria-required=\"true\"><\/div><\/div><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_3_email' id='label_ff_3_email' aria-label=\"Email\">Email<\/label><\/div><div class='ff-el-input--content'><input type=\"email\" name=\"email\" id=\"ff_3_email\" class=\"ff-el-form-control\" placeholder=\"Indirizzo E-mail\" data-name=\"email\"  aria-invalid=\"false\" aria-required=\"true\"><\/div><\/div><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_3_subject' id='label_ff_3_subject' aria-label=\"Telefono\">Telefono<\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"subject\" class=\"ff-el-form-control\" placeholder=\"Telefono\" data-name=\"subject\" id=\"ff_3_subject\"  aria-invalid=\"false\" aria-required=\"true\"><\/div><\/div><div class='ff-el-group'><div class=\"ff-el-input--label asterisk-right\"><label for='ff_3_message' id='label_ff_3_message' aria-label=\"Il tuo Messaggio\">Il tuo Messaggio<\/label><\/div><div class='ff-el-input--content'><textarea aria-required=\"false\" aria-labelledby=\"label_ff_3_message\" name=\"message\" id=\"ff_3_message\" class=\"ff-el-form-control\" placeholder=\"Il tuo Messaggio\" rows=\"5\" cols=\"2\" data-name=\"message\" ><\/textarea><\/div><\/div><div class='ff-el-group ff-text-left ff_submit_btn_wrapper'><button type=\"submit\" class=\"ff-btn ff-btn-submit ff-btn-md ff_btn_style\"  aria-label=\"Invia modulo\">Invia modulo<\/button><\/div><\/fieldset><input type=\"hidden\" name=\"trp-form-language\" value=\"it\"\/><\/form><div id='fluentform_3_errors' class='ff-errors-in-stack ff_form_instance_3_1 ff-form-loading_errors ff_form_instance_3_1_errors'><\/div><\/div>            <script type=\"text\/javascript\">\n                window.fluent_form_ff_form_instance_3_1 = {\"id\":\"3\",\"ajaxUrl\":\"https:\\\/\\\/dfdl.cc\\\/wp-admin\\\/admin-ajax.php\",\"settings\":{\"layout\":{\"labelPlacement\":\"top\",\"helpMessagePlacement\":\"with_label\",\"errorMessagePlacement\":\"inline\",\"cssClassName\":\"\",\"asteriskPlacement\":\"asterisk-right\"},\"restrictions\":{\"denyEmptySubmission\":{\"enabled\":false}}},\"form_instance\":\"ff_form_instance_3_1\",\"form_id_selector\":\"fluentform_3\",\"rules\":{\"input_text\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global_message\":\"This field is required\",\"global\":true}},\"email\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global\":false,\"global_message\":\"This field is required\"},\"email\":{\"value\":true,\"message\":\"This field must contain a valid email\",\"global\":false,\"global_message\":\"This field must contain a valid email\"}},\"subject\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global\":false,\"global_message\":\"This field is required\"}},\"message\":{\"required\":{\"value\":false,\"message\":\"This field is required\",\"global\":false,\"global_message\":\"This field is required\"}}},\"debounce_time\":300,\"file_upload_settings\":[]};\n                            <\/script>","protected":false},"excerpt":{"rendered":"<p>XL-21 Distribution Cabinet: commissioning boundaries. Review ratings, interfaces and verification before ordering.<\/p>","protected":false},"author":1,"featured_media":739,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","rank_math_title":"XL-21 Distribution Cabinet: Commissioning Boundaries","rank_math_description":"XL-21 Distribution Cabinet: commissioning boundaries. Review ratings, interfaces and verification before ordering.","rank_math_canonical_url":"https:\/\/dfdl.cc\/xl-21-commissioning-boundaries-procurement-guide\/","rank_math_focus_keyword":"XL-21 Distribution Cabinet"},"categories":[26],"tags":[],"class_list":["post-1189","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/dfdl.cc\/it\/wp-json\/wp\/v2\/posts\/1189","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dfdl.cc\/it\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dfdl.cc\/it\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dfdl.cc\/it\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dfdl.cc\/it\/wp-json\/wp\/v2\/comments?post=1189"}],"version-history":[{"count":1,"href":"https:\/\/dfdl.cc\/it\/wp-json\/wp\/v2\/posts\/1189\/revisions"}],"predecessor-version":[{"id":1651,"href":"https:\/\/dfdl.cc\/it\/wp-json\/wp\/v2\/posts\/1189\/revisions\/1651"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dfdl.cc\/it\/wp-json\/wp\/v2\/media\/739"}],"wp:attachment":[{"href":"https:\/\/dfdl.cc\/it\/wp-json\/wp\/v2\/media?parent=1189"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dfdl.cc\/it\/wp-json\/wp\/v2\/categories?post=1189"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dfdl.cc\/it\/wp-json\/wp\/v2\/tags?post=1189"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}