{"id":1177,"date":"2026-10-20T08:00:00","date_gmt":"2026-10-20T08:00:00","guid":{"rendered":"https:\/\/dfdl.cc\/?p=1177"},"modified":"2026-10-22T03:53:47","modified_gmt":"2026-10-22T03:53:47","slug":"ggd-short-circuit-duty-procurement-guide","status":"publish","type":"post","link":"https:\/\/dfdl.cc\/it\/ggd-short-circuit-duty-procurement-guide\/","title":{"rendered":"GGD Low Voltage Distribution Cabinet: Short-Circuit Duty Procurement Guide"},"content":{"rendered":"<div class=\"wp-block-rank-math-toc-block\" id=\"rank-math-toc\"><h2>Table of Contents<\/h2><nav><ul><li class=\"\"><a href=\"#1-define-the-short-circuit-duty-decision\">1. Define the short-circuit duty decision<\/a><\/li><li class=\"\"><a href=\"#2-check-the-ggd-configuration-boundary\">2. Check the GGD configuration boundary<\/a><\/li><li class=\"\"><a href=\"#3-short-circuit-duty\">3. Short-Circuit Duty<\/a><\/li><li class=\"\"><a href=\"#4-protection-settings-register\">4. Protection Settings Register<\/a><\/li><li class=\"\"><a href=\"#5-earthing-and-bonding-interfaces\">5. Earthing and Bonding Interfaces<\/a><\/li><li class=\"\"><a href=\"#6-fault-indication-and-alarm-handling\">6. Fault Indication and Alarm Handling<\/a><\/li><li class=\"\"><a href=\"#7-commissioning-boundaries\">7. Commissioning Boundaries<\/a><\/li><li class=\"\"><a href=\"#8-transformer-and-downstream-equipment-interfaces\">8. Transformer and Downstream Equipment Interfaces<\/a><\/li><li class=\"\"><a href=\"#9-compare-the-proposal-with-the-required-evidence\">9. Compare the proposal with the required evidence<\/a><\/li><li class=\"\"><a href=\"#10-work-through-a-project-review-before-release\">10. Work through a project review before release<\/a><\/li><li class=\"\"><a href=\"#11-prepare-the-inquiry-and-acceptance-package\">11. Prepare the inquiry and acceptance package<\/a><\/li><li class=\"\"><a href=\"#12-request-a-configuration-review\">12. Request a configuration review<\/a><\/li><li class=\"\"><a href=\"#frequently-asked-questions\">Frequently asked questions<\/a><\/li><\/ul><\/nav><\/div>\n\n\n<p class=\"wp-block-paragraph\">A GGD low voltage distribution cabinet proposal needs a clear answer to one purchasing question: how will the project compare fault magnitude and duration with equipment capability? The answer should connect the GGD low voltage distribution cabinet to its operating duty, installation interfaces and acceptance records. Selecting a familiar series or comparing a headline price leaves these details unresolved.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This guide examines short-circuit duty for a water-treatment project. Use the review sequence to prepare the technical inquiry, compare offers and identify the information required before manufacturing release. The worked review below is a planning illustration, not a report of a completed Dongfang customer project.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"800\" height=\"800\" src=\"https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/GGD-Series-AC-Low-Voltage-Power-Distribution-Cabinet.jpg\" alt=\"GGD Low Voltage Distribution Cabinet product view for GGD configuration review\" class=\"wp-image-734\" srcset=\"https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/GGD-Series-AC-Low-Voltage-Power-Distribution-Cabinet.jpg 800w, https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/GGD-Series-AC-Low-Voltage-Power-Distribution-Cabinet-300x300.jpg 300w, https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/GGD-Series-AC-Low-Voltage-Power-Distribution-Cabinet-150x150.jpg 150w, https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/GGD-Series-AC-Low-Voltage-Power-Distribution-Cabinet-768x768.jpg 768w, https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/GGD-Series-AC-Low-Voltage-Power-Distribution-Cabinet-600x600.jpg 600w, https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/GGD-Series-AC-Low-Voltage-Power-Distribution-Cabinet-100x100.jpg 100w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"1-define-the-short-circuit-duty-decision\">1. Define the short-circuit duty decision<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For the GGD low voltage distribution cabinet, the immediate objective is to compare fault magnitude and duration with equipment capability. Write that objective into the inquiry and identify the person who owns the engineering decision. Purchasing needs an approved technical basis before it can judge whether different offers describe the same scope.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In a water-treatment project, begin with the process load sequence and the environmental survey. Pumps, controls and auxiliary services can have different interruption consequences. Identify the load sequence and the supply paths supporting essential process functions. Damp areas and outdoor cable routes also need coordinated environmental and drainage requirements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A useful review connects three records: the system requirement, the offered GGD low voltage distribution cabinet configuration and the evidence needed for acceptance. Mark an unknown value as unresolved and assign an action. A plausible number copied from a different model is less useful than a clearly identified question.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"2-check-the-ggd-configuration-boundary\">2. Check the GGD configuration boundary<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The GGD range is presented as fixed low-voltage distribution equipment. Check the complete scheme and the actual offered rating schedule. Values associated with one GGD variant should not be transferred to another variant or to a modified assembly.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Coordinate the fixed devices, maintenance access and outgoing cable layout. An alteration to the device family or enclosure arrangement needs review against the assembly evidence.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A cabinet proposal needs a defined incoming arrangement, outgoing functions and system duty. Fixed distribution, integrated outdoor metering and reactive power functions should be compared by their purpose. Cabinet dimensions and a busbar current alone cannot establish a complete electrical configuration.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Review the <a href=\"https:\/\/dfdl.cc\/it\/prodotto\/ac-low-voltage-power-distribution-cabinet\/\">GGD Serie AC Low Tensione Cabinet di Distribuzione di Potenza<\/a> product entry alongside the <a href=\"https:\/\/dfdl.cc\/it\/categoria-prodotto\/power-distribution-cabinet\/\">Power Distribution Cabinet category<\/a>. Confirm the final offered configuration in controlled drawings and a technical schedule. Use GGD, XL-21 and JP product pages to identify the relevant family. For JP equipment, distinguish the integrated functions actually ordered from optional metering, protection and compensation provisions.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"3-short-circuit-duty\">3. Short-Circuit Duty<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For the GGD low voltage distribution cabinet review, the GGD low voltage distribution cabinet design team should compare fault magnitude and duration with equipment capability. The available fault current is a system result. It depends on the source, transformer, cable paths and contributions from other equipment. Record the study location and the operating arrangement, because a future transformer or parallel source can alter the result. Distinguish the protective device&#x27;s breaking capability from an assembly&#x27;s short-time and peak withstand characteristics.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ask the designer to match both the fault magnitude and the clearing time with the relevant equipment evidence. A current value without a duration is incomplete where short-time withstand is involved. A device rating also does not prove the complete assembly&#x27;s capability. Keep any conditional rating tied to the specified upstream protective device and its settings. The procurement comparison should show the study requirement, the declared capability and any restriction together so that substitutions can be evaluated before manufacture. Keep this point linked to the GGD low voltage distribution cabinet configuration and its approved interface documents.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"4-protection-settings-register\">4. Protection Settings Register<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For the GGD low voltage distribution cabinet review, the GGD low voltage distribution cabinet design team should preserve the approved values and the reasons for them. A settings register should identify each protective device, its location, the approved values and the design revision. Record who approved the settings and what study supports them. Device model, firmware and available setting ranges can matter when equipment is substituted.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Keep the register linked to the single-line diagram and circuit identifiers. Define how factory settings, commissioning changes and later operational changes will be controlled. Qualified personnel should implement and verify settings under the approved procedure. A photographed dial position or copied spreadsheet is incomplete without the device identity and revision context. At handover, retain both the approved register and the verification record. This gives the owner a basis for diagnosing unwanted trips and prevents a replacement device from silently reverting to a different protective behavior. Keep this point linked to the GGD low voltage distribution cabinet configuration and its approved interface documents.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"5-earthing-and-bonding-interfaces\">5. Earthing and Bonding Interfaces<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For the GGD low voltage distribution cabinet review, the GGD low voltage distribution cabinet design team should define the protective connection path across supply boundaries. Earthing and bonding require a coordinated system design. State the incoming protective conductor arrangement, equipment bonding points, cable screen or armour treatment where applicable, and the interface with the site earthing network. The presence of an earth bar is only one part of the requirement.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ask the GGD low voltage distribution cabinet supplier to show accessible connection points and the relevant conductor or terminal provisions on the drawing. Review removable panels, doors and transport splits for continuity requirements. Keep cable screen bonding decisions tied to the cable system study rather than assuming one method suits every route. Qualified personnel should carry out the prescribed inspections and tests under the approved safe work procedure. The handover should record the implemented arrangement so that later modifications do not unintentionally interrupt a protective connection or create an unintended current path. Keep this point linked to the GGD low voltage distribution cabinet configuration and its approved interface documents.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"6-fault-indication-and-alarm-handling\">6. Fault Indication and Alarm Handling<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For the GGD low voltage distribution cabinet review, the GGD low voltage distribution cabinet design team should define what an indication means and what action it supports. A fault indicator or alarm can help locate a problem, but its usefulness depends on the detection principle, setting, location and operating procedure. Identify the event that must be detected and the person or system that will use the information. Distinguish fault indication from protective interruption and from proof that equipment is safe to touch.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Specify local indication, remote reporting, power supply and reset behavior where required. Ask how the device responds to different network arrangements and whether additional data are needed for selection. Include the point in the monitoring schedule and acceptance plan. The operating documentation should explain the meaning and limitations of the indication. This prevents an alarm accessory from being treated as a substitute for protection, isolation or qualified testing during maintenance. Keep this point linked to the GGD low voltage distribution cabinet configuration and its approved interface documents.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"7-commissioning-boundaries\">7. Commissioning Boundaries<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For the GGD low voltage distribution cabinet review, the design team should separate factory checks from site acceptance responsibilities. Commissioning depends on the completed installation and the approved system design. Create a responsibility matrix covering the GGD low voltage distribution cabinet supplier, installer, commissioning team and asset owner. Separate checks that can be completed in the factory from those that depend on site cables, earthing, protection settings or external control systems.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Agree the required records and acceptance criteria before delivery. Each result should identify the GGD low voltage distribution cabinet, instrument or method where relevant, drawing revision and person responsible. Unresolved defects need a disposition and a clear effect on readiness. Qualified personnel should follow the approved de-energization, isolation and testing procedure. Do not interpret a factory pass as permission to energize an incomplete site installation. Handover is stronger when the final records can be traced directly to the equipment identifiers in the asset register. Keep this point linked to the GGD low voltage distribution cabinet configuration and its approved interface documents.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"8-transformer-and-downstream-equipment-interfaces\">8. Transformer and Downstream Equipment Interfaces<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For the GGD low voltage distribution cabinet review, the GGD low voltage distribution cabinet design team should coordinate the connection across voltage transformation. A transformer interface involves more than matching nominal voltage. Record the transformer rating, impedance information needed by the study, connection arrangement, earthing and expected loading. Identify the incoming equipment, outgoing circuits and metering or protection responsibilities on both sides.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Review cable or bus connections, terminal geometry and the effects of source changes on downstream fault duty. If several transformers can operate in parallel, the designer should assess the intended arrangements explicitly. Keep reactive power equipment and standby sources within the same system review where they are present. The equipment supplier needs the approved interface information to propose a suitable configuration. A transformer mentioned in a project solution should not be treated as a confirmed standalone catalogue product without a matching supply scope and technical offer. Keep this point linked to the GGD low voltage distribution cabinet configuration and its approved interface documents.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img decoding=\"async\" width=\"800\" height=\"600\" src=\"https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/Power-distribution-cabinet.jpg\" alt=\"Power Distribution Cabinet range illustrating alternative equipment layouts\" class=\"wp-image-217\" srcset=\"https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/Power-distribution-cabinet.jpg 800w, https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/Power-distribution-cabinet-300x225.jpg 300w, https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/Power-distribution-cabinet-768x576.jpg 768w, https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/Power-distribution-cabinet-600x450.jpg 600w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"9-compare-the-proposal-with-the-required-evidence\">9. Compare the proposal with the required evidence<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Build the comparison around short-circuit duty, then check the related interfaces. For GGD low voltage distribution cabinet, the relevant boundaries include transformer or incoming supply; busbar and protective devices; outgoing cables; metering or compensation; foundation, room layout and maintenance access. Put the requirement and supplier response in adjacent columns so that differences are visible before purchase.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pay particular attention to an outgoing-feeder addition that exceeds the original thermal or source assumptions. Require the approved single-line diagram, general arrangement, declared assembly characteristics and configuration-specific verification. If a supplier proposes an alternative, ask which drawings, ratings, accessories and acceptance steps change. The commercial saving should be evaluated with those effects included.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Review item<\/th><th>Incomplete basis<\/th><th>Useful approval evidence<\/th><\/tr><\/thead><tbody><tr><td>Short-Circuit Duty<\/td><td>A product-family name or an unchecked assumption<\/td><td>A documented basis to compare fault magnitude and duration with equipment capability<\/td><\/tr><tr><td>Operating duty<\/td><td>A headline current or voltage without context<\/td><td>A duty schedule covering the approved operating cases<\/td><\/tr><tr><td>Interfaces<\/td><td>Symbols without cable, control or civil details<\/td><td>transformer or incoming supply; busbar and protective devices; outgoing cables; metering or compensation; foundation, room layout and maintenance access<\/td><\/tr><tr><td>Verification<\/td><td>Unrelated certificates or a similar product demonstration<\/td><td>the approved single-line diagram, general arrangement, declared assembly characteristics and configuration-specific verification<\/td><\/tr><tr><td>Change control<\/td><td>An email substitution with no impact review<\/td><td>An approved revision and identified consequences<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"10-work-through-a-project-review-before-release\">10. Work through a project review before release<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Consider a water-treatment project purchasing GGD low voltage distribution cabinet. The buyer receives two offers that appear to cover the same requirement. Offer A identifies the proposed GGD low voltage distribution cabinet configuration and supplies the supporting interface schedule. Offer B lists a broad series name and leaves the assumptions open. These are illustrative offers, with no invented prices or performance results.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The first review action is to establish the process load sequence and the environmental survey. The second is to ask both bidders how they will compare fault magnitude and duration with equipment capability. Use the same technical questions for both offers. Any difference in protection settings register or earthing and bonding interfaces should be referred to the responsible designer rather than resolved by choosing the lower commercial total.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Before approving the GGD low voltage distribution cabinet order, close the unresolved interface questions and record the selected configuration. Identify what remains dependent on site work and who will verify it. If the requirement changes, reopen the affected assessment. This creates a practical release decision that the receiving and commissioning teams can understand.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"11-prepare-the-inquiry-and-acceptance-package\">11. Prepare the inquiry and acceptance package<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Send the system diagram, load or feeder information, installation conditions and the specific short-circuit duty requirement with the inquiry. For GGD low voltage distribution cabinet, also include the relevant cable or control interfaces and the documents required at handover. State quantities and delivery destination separately from the technical duty.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Dongfang\u2019s <a href=\"https:\/\/dfdl.cc\/it\/solutions\/low-voltage-distribution-control\/\">Power Distribution Cabinet solution support<\/a> can be used as a starting point for discussing the configuration. Ask for a written response that identifies the proposed supply, deviations, evidence and project responsibilities. Final equipment selection should follow the responsible project designer\u2019s assessment.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For the applicable product-standard context, consult the <a href=\"https:\/\/webstore.iec.ch\/en\/publication\/32338\" target=\"_blank\" rel=\"noopener\">IEC low-voltage assembly verification scope<\/a> and specify the required part and edition with the project team. The reference explains the relevant standard family; it does not certify a particular Dongfang configuration.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"12-request-a-configuration-review\">12. Request a configuration review<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">To discuss short-circuit duty for your GGD low voltage distribution cabinet, <a href=\"https:\/\/dfdl.cc\/it\/contact-us\/\">send Dongfang Electric Power your project requirements<\/a>. Include the process load sequence and the environmental survey, the GGD low voltage distribution cabinet schedule and the unresolved interface questions. Request a configuration-specific technical offer and an evidence list for review before purchase.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"frequently-asked-questions\">Frequently asked questions<\/h2>\n\n\n<div id=\"rank-math-faq\" class=\"rank-math-block\">\n<div class=\"rank-math-list\">\n<div id=\"faq-003-1\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">What information is needed to review short-circuit duty for the GGD low voltage distribution cabinet?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Provide the process load sequence and the environmental survey, the approved system diagram and the relevant operating conditions. The review should establish how to compare fault magnitude and duration with equipment capability, then confirm the offered configuration and the acceptance evidence.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-003-2\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Does the GGD product name establish every required rating?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>No. Coordinate the fixed devices, maintenance access and outgoing cable layout. An alteration to the device family or enclosure arrangement needs review against the assembly evidence. The supplied GGD low voltage distribution cabinet needs a controlled technical schedule tied to the actual configuration. A catalogue range or keyword does not confirm every optional function.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-003-3\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Which interfaces need checking before ordering the GGD low voltage distribution cabinet?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Review transformer or incoming supply; busbar and protective devices; outgoing cables; metering or compensation; foundation, room layout and maintenance access. Assign responsibility for each boundary and keep the supplier response aligned with the approved drawings. Unresolved interfaces should remain visible in the review register.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-003-4\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">How should alternative GGD low voltage distribution cabinet offers be compared?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Use the same requirement schedule and ask each bidder for deviations, scope boundaries and evidence. For this decision, compare short-circuit duty with protection settings register and earthing and bonding interfaces so that a price difference does not hide a configuration difference.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-003-5\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">What records should accompany the GGD low voltage distribution cabinet handover?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Retain the approved single-line diagram, general arrangement, declared assembly characteristics and configuration-specific verification, the final drawings, asset identifiers and applicable operating information. Keep factory verification distinct from site acceptance and close open technical items through documented review.<\/p>\n\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n\n<div class='fluentform ff-default fluentform_wrapper_3 ffs_default_wrap'><form data-form_id=\"3\" id=\"fluentform_3\" class=\"frm-fluent-form fluent_form_3 ff-el-form-top ff_form_instance_3_1 ff-form-loading ffs_default\" data-form_instance=\"ff_form_instance_3_1\" method=\"POST\" action=\"\" ><fieldset  style=\"border: none!important;margin: 0!important;padding: 0!important;background-color: transparent!important;box-shadow: none!important;outline: none!important; min-inline-size: 100%;\">\n                    <legend class=\"ff_screen_reader_title\" style=\"display: block; margin: 0!important;padding: 0!important;height: 0!important;text-indent: -999999px;width: 0!important;overflow:hidden;\">Richiesta sito web<\/legend>        <div\n                style=\"display: none!important; position: absolute!important; transform: translateX(1000%)!important;\"\n                class=\"ff-el-group ff-hpsf-container\"\n        >\n            <div class=\"ff-el-input--label asterisk-right\">\n                <label for=\"ff_3_item_sf\" aria-label=\"Contatto\">\n                    Contatto                <\/label>\n            <\/div>\n            <div class=\"ff-el-input--content\">\n                <input type=\"text\"\n                       name=\"item_3__fluent_sf\"\n                       class=\"ff-el-form-control\"\n                       id=\"ff_3_item_sf\"\n                \/>\n            <\/div>\n        <\/div>\n        <input type='hidden' name='__fluent_form_embded_post_id' value='1177' \/><input type=\"hidden\" id=\"_fluentform_3_fluentformnonce\" name=\"_fluentform_3_fluentformnonce\" value=\"9d8d15b745\" \/><input type=\"hidden\" name=\"_wp_http_referer\" value=\"\/it\/wp-json\/wp\/v2\/posts\/1177\" \/><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_3_input_text' id='label_ff_3_input_text' aria-label=\"Nome\">Nome<\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"input_text\" class=\"ff-el-form-control\" placeholder=\"Nome\" data-name=\"input_text\" id=\"ff_3_input_text\"  aria-invalid=\"false\" aria-required=\"true\"><\/div><\/div><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_3_email' id='label_ff_3_email' aria-label=\"Email\">Email<\/label><\/div><div class='ff-el-input--content'><input type=\"email\" name=\"email\" id=\"ff_3_email\" class=\"ff-el-form-control\" placeholder=\"Indirizzo E-mail\" data-name=\"email\"  aria-invalid=\"false\" aria-required=\"true\"><\/div><\/div><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_3_subject' id='label_ff_3_subject' aria-label=\"Telefono\">Telefono<\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"subject\" class=\"ff-el-form-control\" placeholder=\"Telefono\" data-name=\"subject\" id=\"ff_3_subject\"  aria-invalid=\"false\" aria-required=\"true\"><\/div><\/div><div class='ff-el-group'><div class=\"ff-el-input--label asterisk-right\"><label for='ff_3_message' id='label_ff_3_message' aria-label=\"Il tuo Messaggio\">Il tuo Messaggio<\/label><\/div><div class='ff-el-input--content'><textarea aria-required=\"false\" aria-labelledby=\"label_ff_3_message\" name=\"message\" id=\"ff_3_message\" class=\"ff-el-form-control\" placeholder=\"Il tuo Messaggio\" rows=\"5\" cols=\"2\" data-name=\"message\" ><\/textarea><\/div><\/div><div class='ff-el-group ff-text-left ff_submit_btn_wrapper'><button type=\"submit\" class=\"ff-btn ff-btn-submit ff-btn-md ff_btn_style\"  aria-label=\"Invia modulo\">Invia modulo<\/button><\/div><\/fieldset><input type=\"hidden\" name=\"trp-form-language\" value=\"it\"\/><\/form><div id='fluentform_3_errors' class='ff-errors-in-stack ff_form_instance_3_1 ff-form-loading_errors ff_form_instance_3_1_errors'><\/div><\/div>            <script type=\"text\/javascript\">\n                window.fluent_form_ff_form_instance_3_1 = {\"id\":\"3\",\"ajaxUrl\":\"https:\\\/\\\/dfdl.cc\\\/wp-admin\\\/admin-ajax.php\",\"settings\":{\"layout\":{\"labelPlacement\":\"top\",\"helpMessagePlacement\":\"with_label\",\"errorMessagePlacement\":\"inline\",\"cssClassName\":\"\",\"asteriskPlacement\":\"asterisk-right\"},\"restrictions\":{\"denyEmptySubmission\":{\"enabled\":false}}},\"form_instance\":\"ff_form_instance_3_1\",\"form_id_selector\":\"fluentform_3\",\"rules\":{\"input_text\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global_message\":\"This field is required\",\"global\":true}},\"email\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global\":false,\"global_message\":\"This field is required\"},\"email\":{\"value\":true,\"message\":\"This field must contain a valid email\",\"global\":false,\"global_message\":\"This field must contain a valid email\"}},\"subject\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global\":false,\"global_message\":\"This field is required\"}},\"message\":{\"required\":{\"value\":false,\"message\":\"This field is required\",\"global\":false,\"global_message\":\"This field is required\"}}},\"debounce_time\":300,\"file_upload_settings\":[]};\n                            <\/script>","protected":false},"excerpt":{"rendered":"<p>GGD Low Voltage Distribution Cabinet: short-circuit duty. Review ratings, interfaces and verification before ordering.<\/p>","protected":false},"author":1,"featured_media":734,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","rank_math_title":"GGD Low Voltage Distribution Cabinet: Short-Circuit Duty","rank_math_description":"GGD Low Voltage Distribution Cabinet: short-circuit duty. Review ratings, interfaces and verification before ordering.","rank_math_canonical_url":"https:\/\/dfdl.cc\/ggd-short-circuit-duty-procurement-guide\/","rank_math_focus_keyword":"GGD Low Voltage Distribution Cabinet"},"categories":[26],"tags":[],"class_list":["post-1177","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/dfdl.cc\/it\/wp-json\/wp\/v2\/posts\/1177","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dfdl.cc\/it\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dfdl.cc\/it\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dfdl.cc\/it\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dfdl.cc\/it\/wp-json\/wp\/v2\/comments?post=1177"}],"version-history":[{"count":1,"href":"https:\/\/dfdl.cc\/it\/wp-json\/wp\/v2\/posts\/1177\/revisions"}],"predecessor-version":[{"id":1644,"href":"https:\/\/dfdl.cc\/it\/wp-json\/wp\/v2\/posts\/1177\/revisions\/1644"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dfdl.cc\/it\/wp-json\/wp\/v2\/media\/734"}],"wp:attachment":[{"href":"https:\/\/dfdl.cc\/it\/wp-json\/wp\/v2\/media?parent=1177"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dfdl.cc\/it\/wp-json\/wp\/v2\/categories?post=1177"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dfdl.cc\/it\/wp-json\/wp\/v2\/tags?post=1177"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}