{"id":1176,"date":"2026-10-19T08:00:00","date_gmt":"2026-10-19T08:00:00","guid":{"rendered":"https:\/\/dfdl.cc\/?p=1176"},"modified":"2026-10-22T03:53:36","modified_gmt":"2026-10-22T03:53:36","slug":"pz-cable-entry-layout-procurement-guide","status":"publish","type":"post","link":"https:\/\/dfdl.cc\/it\/pz-cable-entry-layout-procurement-guide\/","title":{"rendered":"Lighting Distribution Box: Cable Entry Layout Procurement Guide"},"content":{"rendered":"<div class=\"wp-block-rank-math-toc-block\" id=\"rank-math-toc\"><h2>Table of Contents<\/h2><nav><ul><li class=\"\"><a href=\"#1-define-the-cable-entry-layout-decision\">1. Define the cable entry layout decision<\/a><\/li><li class=\"\"><a href=\"#2-check-the-pz-configuration-boundary\">2. Check the PZ configuration boundary<\/a><\/li><li class=\"\"><a href=\"#3-cable-entry-layout\">3. Cable Entry Layout<\/a><\/li><li class=\"\"><a href=\"#4-cable-bending-and-pulling-space\">4. Cable Bending and Pulling Space<\/a><\/li><li class=\"\"><a href=\"#5-cable-current-capacity-and-derating\">5. Cable Current Capacity and Derating<\/a><\/li><li class=\"\"><a href=\"#6-neutral-and-phase-loading\">6. Neutral and Phase Loading<\/a><\/li><li class=\"\"><a href=\"#7-foundation-and-trench-interfaces\">7. Foundation and Trench Interfaces<\/a><\/li><li class=\"\"><a href=\"#8-voltage-and-insulation-duty\">8. Voltage and Insulation Duty<\/a><\/li><li class=\"\"><a href=\"#9-compare-the-proposal-with-the-required-evidence\">9. Compare the proposal with the required evidence<\/a><\/li><li class=\"\"><a href=\"#10-work-through-a-project-review-before-release\">10. Work through a project review before release<\/a><\/li><li class=\"\"><a href=\"#11-prepare-the-inquiry-and-acceptance-package\">11. Prepare the inquiry and acceptance package<\/a><\/li><li class=\"\"><a href=\"#12-request-a-configuration-review\">12. Request a configuration review<\/a><\/li><li class=\"\"><a href=\"#frequently-asked-questions\">Frequently asked questions<\/a><\/li><\/ul><\/nav><\/div>\n\n\n<p class=\"wp-block-paragraph\">A lighting distribution box proposal needs a clear answer to one purchasing question: how will the project reserve usable termination space before fabrication? The answer should connect the lighting distribution box to its operating duty, installation interfaces and acceptance records. Selecting a familiar series or comparing a headline price leaves these details unresolved.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This guide examines cable entry layout for a process-industry replacement. Use the review sequence to prepare the technical inquiry, compare offers and identify the information required before manufacturing release. The worked review below is a planning illustration, not a report of a completed Dongfang customer project.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"800\" height=\"800\" src=\"https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/PZ-Series-Lighting-Distribution-Box.jpg\" alt=\"Lighting Distribution Box product view for PZ configuration review\" class=\"wp-image-727\" srcset=\"https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/PZ-Series-Lighting-Distribution-Box.jpg 800w, https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/PZ-Series-Lighting-Distribution-Box-300x300.jpg 300w, https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/PZ-Series-Lighting-Distribution-Box-150x150.jpg 150w, https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/PZ-Series-Lighting-Distribution-Box-768x768.jpg 768w, https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/PZ-Series-Lighting-Distribution-Box-600x600.jpg 600w, https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/PZ-Series-Lighting-Distribution-Box-100x100.jpg 100w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"1-define-the-cable-entry-layout-decision\">1. Define the cable entry layout decision<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For the lighting distribution box, the immediate objective is to reserve usable termination space before fabrication. Write that objective into the inquiry and identify the person who owns the engineering decision. Purchasing needs an approved technical basis before it can judge whether different offers describe the same scope.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In a process-industry replacement, begin with the retrofit survey and the agreed restoration criteria. The existing equipment has to be replaced within a controlled outage. Record the cable and control interfaces before selecting a replacement. The transition plan should include inspection, correction of defects and the conditions for returning the system to service.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A useful review connects three records: the system requirement, the offered lighting distribution box configuration and the evidence needed for acceptance. Mark an unknown value as unresolved and assign an action. A plausible number copied from a different model is less useful than a clearly identified question.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"2-check-the-pz-configuration-boundary\">2. Check the PZ configuration boundary<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The PZ range is presented for terminal lighting and distribution circuits, with surface and concealed mounting options. Confirm usable module space against the selected protective devices, not just the model suffix. Neutral and protective conductor arrangements, the incoming device and the external cable space must be resolved together.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Count complete circuit functions, including multi-pole devices and accessories. Reserve space for termination and identification rather than treating every empty rail position as an immediately usable circuit.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Final-circuit distribution, lighting circuits, outdoor distribution and dual-source transfer have different functions. Select the configuration from the actual circuit schedule. A distribution box intended for terminal circuits should not be substituted for a main distribution assembly merely because it has enough mounting space.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Review the <a href=\"https:\/\/dfdl.cc\/it\/prodotto\/pz-series-lighting-distribution-box\/\">Scatola di distribuzione dell'illuminazione serie PZ<\/a> product entry alongside the <a href=\"https:\/\/dfdl.cc\/it\/categoria-prodotto\/power-distribution-box\/\">Power Distribution Box category<\/a>. Confirm the final offered configuration in controlled drawings and a technical schedule. Identify PZ lighting, SXL transfer or ZX outdoor requirements individually. An outdoor label does not establish an IP65 rating, and an automatic transfer arrangement does not promise zero interruption.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"3-cable-entry-layout\">3. Cable Entry Layout<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For the lighting distribution box review, the lighting distribution box design team should reserve usable termination space before fabrication. Cable entry affects the enclosure layout, foundation and installation sequence. Record top or bottom entry, conductor quantity, cable outside diameters, gland requirements and the direction from which cables approach. Confirm which party supplies glands, sealing systems, terminal hardware and support brackets. A drawing that shows only a cable symbol can hide a substantial installation conflict.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Check the route from the external tray or trench to the actual termination point. Cables need support and room for preparation as well as bending space. Segregate control and power routes where the lighting distribution box design requires it. Submit actual cable information before approving the general arrangement, and review changes in conductor size or cable construction as layout changes. This prevents an apparently interchangeable cable substitution from creating a termination problem that can only be corrected on site. Keep this point linked to the lighting distribution box configuration and its approved interface documents.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"4-cable-bending-and-pulling-space\">4. Cable Bending and Pulling Space<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For the lighting distribution box review, the design team should fit the cable route to the selected cable and accessories. Minimum bending requirements depend on cable construction, size and whether the cable is being installed or left in its final position. A rule remembered from another cable family is not a reliable design input. Obtain the selected manufacturer&#x27;s requirements and coordinate them with the termination accessory&#x27;s preparation dimensions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Review the tightest section of the route, including entry plates, trenches, duct mouths and the space between a cable support and its terminal. The plan should identify pulling direction, support arrangements and the limits specified for installation. Do not use a forced bend to solve an enclosure clash. If the route cannot accommodate the approved cable, revise the route or equipment geometry before delivery. Keep the lighting distribution box installation method and accessory instructions available to the qualified installation team and retain the resulting acceptance records. Keep this point linked to the lighting distribution box configuration and its approved interface documents.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"5-cable-current-capacity-and-derating\">5. Cable Current Capacity and Derating<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For the lighting distribution box review, the design team should base cable selection on route conditions and protective coordination. Cable current capacity depends on construction, installation method, ambient conditions, grouping and the surrounding thermal environment. A conductor cross-section is therefore insufficient as a purchase specification. Record route length, method of installation and the conditions that govern the most demanding section.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Have the designer assess current capacity, voltage drop, fault withstand and protection together. Do not substitute a universal current-per-area rule for the applicable calculation. Underground routes need the relevant soil and grouping assumptions, while trays and ducts have their own installation factors. Keep the selected cable construction and accessory requirements aligned with the calculation. If the route or operating duty changes, revisit the selection. The final cable schedule should preserve the basis for the approved size, allowing later extensions to be assessed without reconstructing the original assumptions. Keep this point linked to the lighting distribution box configuration and its approved interface documents.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"6-neutral-and-phase-loading\">6. Neutral and Phase Loading<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For the lighting distribution box review, the design team should decide where neutral capacity and separation are relevant. Neutral arrangements must follow the actual system. In low-voltage distribution with substantial single-phase or nonlinear loads, the designer should assess phase balance, neutral loading and the required separation of neutral and protective conductors. A three-phase current total does not establish the neutral requirement. Keep the earthing system and switching arrangement visible in the design information.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For medium-voltage equipment without a distributed neutral, address the applicable screens, bonding and system earthing instead of copying a low-voltage neutral-bar checklist. Where source transfer is involved, the neutral switching decision must be coordinated with both sources and protection. Ask for a clear conductor schedule and terminal identification. The acceptance documents should make the selected lighting distribution box arrangement understandable to the operating team, especially where the facility contains several sources or changes between normal and standby supply. Keep this point linked to the lighting distribution box configuration and its approved interface documents.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"7-foundation-and-trench-interfaces\">7. Foundation and Trench Interfaces<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For the lighting distribution box review, the design team should coordinate civil work with the approved equipment drawing. Civil interfaces need dimensions, tolerances and responsibility. Establish the foundation arrangement, fixing points, cable trench position, entry openings and any drainage provisions. Outdoor installations also need a review of surface water paths and the relationship between equipment level and surrounding ground.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Release civil work from the approved interface drawing rather than an early catalogue outline. Confirm whether the lighting distribution box is delivered as one section or several and how alignment will be checked. Include the condition of the foundation and cable routes in the receiving inspection before installation begins. Late changes to cable size or entry direction can affect civil work as well as the electrical layout. Record the final arrangement so that future extensions do not obstruct drainage, access or the original support provisions. Keep this point linked to the lighting distribution box configuration and its approved interface documents.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"8-voltage-and-insulation-duty\">8. Voltage and Insulation Duty<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For the lighting distribution box review, the design team should match the actual system and insulation requirements. Nominal system voltage, equipment operating voltage, insulation voltage and impulse withstand describe different duties. Record them separately in the technical schedule. Include frequency and the earthing arrangement, and identify any abnormal operating condition that the designer expects the lighting distribution box installation to withstand. A familiar series name cannot establish these characteristics for an individual configuration.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For cables, use the complete voltage designation and identify the system conditions behind it. For an assembly, request the declared ratings and the evidence applicable to the supplied design. Where a brochure and a technical table disagree, treat the value as unresolved until the lighting distribution box supplier issues a controlled clarification. Do not select the more attractive number. The approved rating schedule should become part of the purchase specification and remain traceable to the nameplate and final documents. Keep this point linked to the lighting distribution box configuration and its approved interface documents.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img decoding=\"async\" width=\"800\" height=\"600\" src=\"https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/Power-distribution-box-1.jpg\" alt=\"Power Distribution Box range illustrating alternative equipment layouts\" class=\"wp-image-212\" srcset=\"https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/Power-distribution-box-1.jpg 800w, https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/Power-distribution-box-1-300x225.jpg 300w, https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/Power-distribution-box-1-768x576.jpg 768w, https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/Power-distribution-box-1-600x450.jpg 600w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"9-compare-the-proposal-with-the-required-evidence\">9. Compare the proposal with the required evidence<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Build the comparison around cable entry layout, then check the related interfaces. For lighting distribution box, the relevant boundaries include incoming supply and protective device; outgoing circuit schedule; neutral and protective conductor arrangement; mounting and cable entry; required transfer or metering functions. Put the requirement and supplier response in adjacent columns so that differences are visible before purchase.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pay particular attention to a crowded final-circuit layout with insufficient termination space. Require the approved circuit schedule, assembly ratings, enclosure details and routine verification records. If a supplier proposes an alternative, ask which drawings, ratings, accessories and acceptance steps change. The commercial saving should be evaluated with those effects included.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Review item<\/th><th>Incomplete basis<\/th><th>Useful approval evidence<\/th><\/tr><\/thead><tbody><tr><td>Cable Entry Layout<\/td><td>A product-family name or an unchecked assumption<\/td><td>A documented basis to reserve usable termination space before fabrication<\/td><\/tr><tr><td>Operating duty<\/td><td>A headline current or voltage without context<\/td><td>A duty schedule covering the approved operating cases<\/td><\/tr><tr><td>Interfaces<\/td><td>Symbols without cable, control or civil details<\/td><td>incoming supply and protective device; outgoing circuit schedule; neutral and protective conductor arrangement; mounting and cable entry; required transfer or metering functions<\/td><\/tr><tr><td>Verification<\/td><td>Unrelated certificates or a similar product demonstration<\/td><td>the approved circuit schedule, assembly ratings, enclosure details and routine verification records<\/td><\/tr><tr><td>Change control<\/td><td>An email substitution with no impact review<\/td><td>An approved revision and identified consequences<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"10-work-through-a-project-review-before-release\">10. Work through a project review before release<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Consider a process-industry replacement purchasing lighting distribution box. The buyer receives two offers that appear to cover the same requirement. Offer A identifies the proposed lighting distribution box configuration and supplies the supporting interface schedule. Offer B lists a broad series name and leaves the assumptions open. These are illustrative offers, with no invented prices or performance results.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The first review action is to establish the retrofit survey and the agreed restoration criteria. The second is to ask both bidders how they will reserve usable termination space before fabrication. Use the same technical questions for both offers. Any difference in cable bending and pulling space or cable current capacity and derating should be referred to the responsible designer rather than resolved by choosing the lower commercial total.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Before approving the lighting distribution box order, close the unresolved interface questions and record the selected configuration. Identify what remains dependent on site work and who will verify it. If the requirement changes, reopen the affected assessment. This creates a practical release decision that the receiving and commissioning teams can understand.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"11-prepare-the-inquiry-and-acceptance-package\">11. Prepare the inquiry and acceptance package<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Send the system diagram, load or feeder information, installation conditions and the specific cable entry layout requirement with the inquiry. For lighting distribution box, also include the relevant cable or control interfaces and the documents required at handover. State quantities and delivery destination separately from the technical duty.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Dongfang\u2019s <a href=\"https:\/\/dfdl.cc\/it\/solutions\/low-voltage-distribution-control\/\">Power Distribution Box solution support<\/a> can be used as a starting point for discussing the configuration. Ask for a written response that identifies the proposed supply, deviations, evidence and project responsibilities. Final equipment selection should follow the responsible project designer\u2019s assessment.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For the applicable product-standard context, consult the <a href=\"https:\/\/webstore.iec.ch\/en\/publication\/32338\" target=\"_blank\" rel=\"noopener\">IEC low-voltage assembly verification scope<\/a> and specify the required part and edition with the project team. The reference explains the relevant standard family; it does not certify a particular Dongfang configuration.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"12-request-a-configuration-review\">12. Request a configuration review<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">To discuss cable entry layout for your lighting distribution box, <a href=\"https:\/\/dfdl.cc\/it\/contact-us\/\">send Dongfang Electric Power your project requirements<\/a>. Include the retrofit survey and the agreed restoration criteria, the lighting distribution box schedule and the unresolved interface questions. Request a configuration-specific technical offer and an evidence list for review before purchase.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"frequently-asked-questions\">Frequently asked questions<\/h2>\n\n\n<div id=\"rank-math-faq\" class=\"rank-math-block\">\n<div class=\"rank-math-list\">\n<div id=\"faq-002-1\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">What information is needed to review cable entry layout for the lighting distribution box?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Provide the retrofit survey and the agreed restoration criteria, the approved system diagram and the relevant operating conditions. The review should establish how to reserve usable termination space before fabrication, then confirm the offered configuration and the acceptance evidence.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-002-2\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Does the PZ product name establish every required rating?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>No. Count complete circuit functions, including multi-pole devices and accessories. Reserve space for termination and identification rather than treating every empty rail position as an immediately usable circuit. The supplied lighting distribution box needs a controlled technical schedule tied to the actual configuration. A catalogue range or keyword does not confirm every optional function.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-002-3\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Which interfaces need checking before ordering the lighting distribution box?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Review incoming supply and protective device; outgoing circuit schedule; neutral and protective conductor arrangement; mounting and cable entry; required transfer or metering functions. Assign responsibility for each boundary and keep the supplier response aligned with the approved drawings. Unresolved interfaces should remain visible in the review register.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-002-4\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">How should alternative lighting distribution box offers be compared?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Use the same requirement schedule and ask each bidder for deviations, scope boundaries and evidence. For this decision, compare cable entry layout with cable bending and pulling space and cable current capacity and derating so that a price difference does not hide a configuration difference.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-002-5\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">What records should accompany the lighting distribution box handover?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Retain the approved circuit schedule, assembly ratings, enclosure details and routine verification records, the final drawings, asset identifiers and applicable operating information. Keep factory verification distinct from site acceptance and close open technical items through documented review.<\/p>\n\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n\n<div class='fluentform ff-default fluentform_wrapper_3 ffs_default_wrap'><form data-form_id=\"3\" id=\"fluentform_3\" class=\"frm-fluent-form fluent_form_3 ff-el-form-top ff_form_instance_3_1 ff-form-loading ffs_default\" data-form_instance=\"ff_form_instance_3_1\" method=\"POST\" action=\"\" ><fieldset  style=\"border: none!important;margin: 0!important;padding: 0!important;background-color: transparent!important;box-shadow: none!important;outline: none!important; min-inline-size: 100%;\">\n                    <legend class=\"ff_screen_reader_title\" style=\"display: block; margin: 0!important;padding: 0!important;height: 0!important;text-indent: -999999px;width: 0!important;overflow:hidden;\">Richiesta sito web<\/legend>        <div\n                style=\"display: none!important; position: absolute!important; transform: translateX(1000%)!important;\"\n                class=\"ff-el-group ff-hpsf-container\"\n        >\n            <div class=\"ff-el-input--label asterisk-right\">\n                <label for=\"ff_3_item_sf\" aria-label=\"Avvisare\">\n                    Avvisare                <\/label>\n            <\/div>\n            <div class=\"ff-el-input--content\">\n                <input type=\"text\"\n                       name=\"item_3__fluent_sf\"\n                       class=\"ff-el-form-control\"\n                       id=\"ff_3_item_sf\"\n                \/>\n            <\/div>\n        <\/div>\n        <input type='hidden' name='__fluent_form_embded_post_id' value='1176' \/><input type=\"hidden\" id=\"_fluentform_3_fluentformnonce\" name=\"_fluentform_3_fluentformnonce\" value=\"9d8d15b745\" \/><input type=\"hidden\" name=\"_wp_http_referer\" value=\"\/it\/wp-json\/wp\/v2\/posts\/1176\" \/><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_3_input_text' id='label_ff_3_input_text' aria-label=\"Nome\">Nome<\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"input_text\" class=\"ff-el-form-control\" placeholder=\"Nome\" data-name=\"input_text\" id=\"ff_3_input_text\"  aria-invalid=\"false\" aria-required=\"true\"><\/div><\/div><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_3_email' id='label_ff_3_email' aria-label=\"Email\">Email<\/label><\/div><div class='ff-el-input--content'><input type=\"email\" name=\"email\" id=\"ff_3_email\" class=\"ff-el-form-control\" placeholder=\"Indirizzo E-mail\" data-name=\"email\"  aria-invalid=\"false\" aria-required=\"true\"><\/div><\/div><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_3_subject' id='label_ff_3_subject' aria-label=\"Telefono\">Telefono<\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"subject\" class=\"ff-el-form-control\" placeholder=\"Telefono\" data-name=\"subject\" id=\"ff_3_subject\"  aria-invalid=\"false\" aria-required=\"true\"><\/div><\/div><div class='ff-el-group'><div class=\"ff-el-input--label asterisk-right\"><label for='ff_3_message' id='label_ff_3_message' aria-label=\"Il tuo Messaggio\">Il tuo Messaggio<\/label><\/div><div class='ff-el-input--content'><textarea aria-required=\"false\" aria-labelledby=\"label_ff_3_message\" name=\"message\" id=\"ff_3_message\" class=\"ff-el-form-control\" placeholder=\"Il tuo Messaggio\" rows=\"5\" cols=\"2\" data-name=\"message\" ><\/textarea><\/div><\/div><div class='ff-el-group ff-text-left ff_submit_btn_wrapper'><button type=\"submit\" class=\"ff-btn ff-btn-submit ff-btn-md ff_btn_style\"  aria-label=\"Invia modulo\">Invia modulo<\/button><\/div><\/fieldset><input type=\"hidden\" name=\"trp-form-language\" value=\"it\"\/><\/form><div id='fluentform_3_errors' class='ff-errors-in-stack ff_form_instance_3_1 ff-form-loading_errors ff_form_instance_3_1_errors'><\/div><\/div>            <script type=\"text\/javascript\">\n                window.fluent_form_ff_form_instance_3_1 = {\"id\":\"3\",\"ajaxUrl\":\"https:\\\/\\\/dfdl.cc\\\/wp-admin\\\/admin-ajax.php\",\"settings\":{\"layout\":{\"labelPlacement\":\"top\",\"helpMessagePlacement\":\"with_label\",\"errorMessagePlacement\":\"inline\",\"cssClassName\":\"\",\"asteriskPlacement\":\"asterisk-right\"},\"restrictions\":{\"denyEmptySubmission\":{\"enabled\":false}}},\"form_instance\":\"ff_form_instance_3_1\",\"form_id_selector\":\"fluentform_3\",\"rules\":{\"input_text\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global_message\":\"This field is required\",\"global\":true}},\"email\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global\":false,\"global_message\":\"This field is required\"},\"email\":{\"value\":true,\"message\":\"This field must contain a valid email\",\"global\":false,\"global_message\":\"This field must contain a valid email\"}},\"subject\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global\":false,\"global_message\":\"This field is required\"}},\"message\":{\"required\":{\"value\":false,\"message\":\"This field is required\",\"global\":false,\"global_message\":\"This field is required\"}}},\"debounce_time\":300,\"file_upload_settings\":[]};\n                            <\/script>","protected":false},"excerpt":{"rendered":"<p>Lighting Distribution Box: cable entry layout. Review ratings, interfaces and verification before ordering.<\/p>","protected":false},"author":1,"featured_media":727,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","rank_math_title":"Lighting Distribution Box: Cable Entry Layout","rank_math_description":"Lighting Distribution Box: cable entry layout. Review ratings, interfaces and verification before ordering.","rank_math_canonical_url":"https:\/\/dfdl.cc\/pz-cable-entry-layout-procurement-guide\/","rank_math_focus_keyword":"Lighting Distribution Box"},"categories":[26],"tags":[],"class_list":["post-1176","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/dfdl.cc\/it\/wp-json\/wp\/v2\/posts\/1176","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dfdl.cc\/it\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dfdl.cc\/it\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dfdl.cc\/it\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dfdl.cc\/it\/wp-json\/wp\/v2\/comments?post=1176"}],"version-history":[{"count":1,"href":"https:\/\/dfdl.cc\/it\/wp-json\/wp\/v2\/posts\/1176\/revisions"}],"predecessor-version":[{"id":1643,"href":"https:\/\/dfdl.cc\/it\/wp-json\/wp\/v2\/posts\/1176\/revisions\/1643"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dfdl.cc\/it\/wp-json\/wp\/v2\/media\/727"}],"wp:attachment":[{"href":"https:\/\/dfdl.cc\/it\/wp-json\/wp\/v2\/media?parent=1176"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dfdl.cc\/it\/wp-json\/wp\/v2\/categories?post=1176"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dfdl.cc\/it\/wp-json\/wp\/v2\/tags?post=1176"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}