{"id":1188,"date":"2026-11-04T08:00:00","date_gmt":"2026-11-04T08:00:00","guid":{"rendered":"https:\/\/dfdl.cc\/?p=1188"},"modified":"2026-11-04T08:00:00","modified_gmt":"2026-11-04T08:00:00","slug":"zx-commissioning-boundaries-procurement-guide","status":"publish","type":"post","link":"https:\/\/dfdl.cc\/ar\/zx-commissioning-boundaries-procurement-guide\/","title":{"rendered":"Outdoor Distribution Box: Commissioning Boundaries Procurement Guide"},"content":{"rendered":"<div class=\"wp-block-rank-math-toc-block\" id=\"rank-math-toc\"><h2>\u062c\u062f\u0648\u0644 \u0627\u0644\u0645\u062d\u062a\u0648\u064a\u0627\u062a<\/h2><nav><ul><li class=\"\"><a href=\"#1-define-the-commissioning-boundaries-decision\">1. Define the commissioning boundaries decision<\/a><\/li><li class=\"\"><a href=\"#2-check-the-zx-configuration-boundary\">2. Check the ZX configuration boundary<\/a><\/li><li class=\"\"><a href=\"#3-commissioning-boundaries\">3. Commissioning Boundaries<\/a><\/li><li class=\"\"><a href=\"#4-test-evidence-and-configuration-traceability\">4. Test Evidence and Configuration Traceability<\/a><\/li><li class=\"\"><a href=\"#5-protection-settings-register\">5. Protection Settings Register<\/a><\/li><li class=\"\"><a href=\"#6-quotation-scope-and-exclusions\">6. Quotation Scope and Exclusions<\/a><\/li><li class=\"\"><a href=\"#7-instrument-transformer-selection\">7. Instrument Transformer Selection<\/a><\/li><li class=\"\"><a href=\"#8-protection-selectivity\">8. Protection Selectivity<\/a><\/li><li class=\"\"><a href=\"#9-compare-the-proposal-with-the-required-evidence\">9. Compare the proposal with the required evidence<\/a><\/li><li class=\"\"><a href=\"#10-work-through-a-project-review-before-release\">10. Work through a project review before release<\/a><\/li><li class=\"\"><a href=\"#11-prepare-the-inquiry-and-acceptance-package\">11. Prepare the inquiry and acceptance package<\/a><\/li><li class=\"\"><a href=\"#12-request-a-configuration-review\">12. Request a configuration review<\/a><\/li><li class=\"\"><a href=\"#frequently-asked-questions\">Frequently asked questions<\/a><\/li><\/ul><\/nav><\/div>\n\n\n<p class=\"wp-block-paragraph\">An outdoor distribution box proposal needs a clear answer to one purchasing question: how will the project separate factory checks from site acceptance responsibilities? The answer should connect the outdoor distribution box to its operating duty, installation interfaces and acceptance records. Selecting a familiar series or comparing a headline price leaves these details unresolved.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This guide examines commissioning boundaries for a commercial building refurbishment. Use the review sequence to prepare the technical inquiry, compare offers and identify the information required before manufacturing release. The worked review below is a planning illustration, not a report of a completed Dongfang customer project.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"800\" height=\"800\" src=\"https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/ZX-Series-Outdoor-Power-Distribution-Box.jpg\" alt=\"Outdoor Distribution Box product view for ZX configuration review\" class=\"wp-image-731\" srcset=\"https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/ZX-Series-Outdoor-Power-Distribution-Box.jpg 800w, https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/ZX-Series-Outdoor-Power-Distribution-Box-300x300.jpg 300w, https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/ZX-Series-Outdoor-Power-Distribution-Box-150x150.jpg 150w, https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/ZX-Series-Outdoor-Power-Distribution-Box-768x768.jpg 768w, https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/ZX-Series-Outdoor-Power-Distribution-Box-600x600.jpg 600w, https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/ZX-Series-Outdoor-Power-Distribution-Box-100x100.jpg 100w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"1-define-the-commissioning-boundaries-decision\">1. Define the commissioning boundaries decision<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For the outdoor distribution box, the immediate objective is to separate factory checks from site acceptance responsibilities. Write that objective into the inquiry and identify the person who owns the engineering decision. Purchasing needs an approved technical basis before it can judge whether different offers describe the same scope.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In a commercial building refurbishment, begin with the circuit survey and the occupied-building work constraints. Tenants and fit-out requirements are changing while parts of the building remain occupied. Reconcile the existing circuit identifiers with the new drawings and establish which services must remain available. The installation plan needs temporary arrangements and a clear handover between existing and replacement equipment.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A useful review connects three records: the system requirement, the offered outdoor distribution box configuration and the evidence needed for acceptance. Mark an unknown value as unresolved and assign an action. A plausible number copied from a different model is less useful than a clearly identified question.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"2-check-the-zx-configuration-boundary\">2. Check the ZX configuration boundary<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The ZX product is described as an outdoor integrated distribution arrangement. Review which metering, outgoing and compensation functions are included in the offer. The environmental design must address the outdoor distribution box installation as a whole, including cable entries and the supporting structure.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">State the exposure, mounting location and auxiliary supply needs. Ask for the enclosure declaration applicable to the offered layout rather than assume a particular IP level from the outdoor designation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Final-circuit distribution, lighting circuits, outdoor distribution and dual-source transfer have different functions. Select the configuration from the actual circuit schedule. A distribution box intended for terminal circuits should not be substituted for a main distribution assembly merely because it has enough mounting space.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Review the <a href=\"https:\/\/dfdl.cc\/ar\/product\/zx-series-outdoor-power-distribution-box\/\">ZX Series Outdoor Power Distribution Box<\/a> product entry alongside the <a href=\"https:\/\/dfdl.cc\/ar\/product-category\/power-distribution-box\/\">Power Distribution Box category<\/a>. Confirm the final offered configuration in controlled drawings and a technical schedule. Identify PZ lighting, SXL transfer or ZX outdoor requirements individually. An outdoor label does not establish an IP65 rating, and an automatic transfer arrangement does not promise zero interruption.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"3-commissioning-boundaries\">3. Commissioning Boundaries<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For the outdoor distribution box review, the design team should separate factory checks from site acceptance responsibilities. Commissioning depends on the completed installation and the approved system design. Create a responsibility matrix covering the outdoor distribution box supplier, installer, commissioning team and asset owner. Separate checks that can be completed in the factory from those that depend on site cables, earthing, protection settings or external control systems.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Agree the required records and acceptance criteria before delivery. Each result should identify the outdoor distribution box, instrument or method where relevant, drawing revision and person responsible. Unresolved defects need a disposition and a clear effect on readiness. Qualified personnel should follow the approved de-energization, isolation and testing procedure. Do not interpret a factory pass as permission to energize an incomplete site installation. Handover is stronger when the final records can be traced directly to the equipment identifiers in the asset register. Keep this point linked to the outdoor distribution box configuration and its approved interface documents.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"4-test-evidence-and-configuration-traceability\">4. Test Evidence and Configuration Traceability<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For the outdoor distribution box review, the design team should request evidence that corresponds to the outdoor distribution box supplied. Test evidence needs an identifiable scope. Ask which product, construction, rating and revision the document covers and how it relates to the proposed equipment. Distinguish design verification, routine checks, component evidence and site acceptance records. They answer different questions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Create an evidence schedule with document references and the requirement each document supports. A certificate title or laboratory logo does not establish every performance claim made in a quotation. Where the supplied configuration differs from the tested design, request the manufacturer&#x27;s explanation of the applicable verification route. Keep unresolved differences visible until reviewed. The purchase and handover files should make the connection between the outdoor distribution box, its declared characteristics and the supporting evidence clear enough for a later technical reviewer to follow without relying on sales correspondence. Keep this point linked to the outdoor distribution box configuration and its approved interface documents.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"5-protection-settings-register\">5. Protection Settings Register<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For the outdoor distribution box review, the outdoor distribution box design team should preserve the approved values and the reasons for them. A settings register should identify each protective device, its location, the approved values and the design revision. Record who approved the settings and what study supports them. Device model, firmware and available setting ranges can matter when equipment is substituted.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Keep the register linked to the single-line diagram and circuit identifiers. Define how factory settings, commissioning changes and later operational changes will be controlled. Qualified personnel should implement and verify settings under the approved procedure. A photographed dial position or copied spreadsheet is incomplete without the device identity and revision context. At handover, retain both the approved register and the verification record. This gives the owner a basis for diagnosing unwanted trips and prevents a replacement device from silently reverting to a different protective behavior. Keep this point linked to the outdoor distribution box configuration and its approved interface documents.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"6-quotation-scope-and-exclusions\">6. Quotation Scope and Exclusions<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For the outdoor distribution box review, the design team should compare complete technical offers on a common basis. A price comparison is meaningful only when the technical scope is aligned. Use a common schedule for ratings, circuit functions, accessories, drawings, verification, packing and delivery terms. Ask suppliers to identify deviations explicitly instead of relying on a general statement of compliance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Separate included equipment from optional items and site work. Define responsibility for glands, cable accessories, external wiring, foundations, communication integration and commissioning support. Record the effect of each exclusion on the project budget and programme. A cheaper offer may be suitable if its boundaries are understood and covered elsewhere. Before purchase, issue a final agreed scope with the unresolved items closed or assigned. This prevents a commercial comparison from hiding technical differences that become expensive after manufacturing has started. Keep this point linked to the outdoor distribution box configuration and its approved interface documents.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"7-instrument-transformer-selection\">7. Instrument Transformer Selection<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For the outdoor distribution box review, the design team should separate measurement and protection requirements. Instrument transformer selection depends on the function served. A protection circuit and a revenue or operational measurement circuit may need different accuracy behavior and different supporting information. Record the primary duty, connected burden, secondary arrangement, cable route and the outdoor distribution box receiving the signal. A ratio copied from a previous project is an incomplete specification.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Have the responsible designer assess the proposed transformers against the system study and the connected devices. Require terminal identification, polarity information and the approved secondary connection diagram. Include safe test and isolation provisions in the engineering review. Do not treat secondary wiring changes as a minor commercial substitution. The acceptance file should show what was supplied, how it was connected and which verification records apply, so that later meter or relay replacement can be evaluated against the original design basis. Keep this point linked to the outdoor distribution box configuration and its approved interface documents.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"8-protection-selectivity\">8. Protection Selectivity<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For the outdoor distribution box review, the design team should define which part of the system should disconnect. Selectivity starts with the required outage boundary. Identify which downstream fault should be isolated without interrupting healthy loads and which operating cases must be assessed. Compare overload and fault regions separately. A larger upstream breaker is not, by itself, evidence that downstream faults will clear selectively.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Request the applicable device data, settings and coordination evidence for the proposed combination. For a fuse and switching arrangement, the designer should also assess the interaction between the protective functions and the connected equipment. Keep changes to breaker family, fuse characteristics and source impedance under technical review. The final handover should contain a settings register that identifies the installed devices, the approved values and the revision used for acceptance. This makes later troubleshooting and expansion much more reliable than retaining a general brochure. Keep this point linked to the outdoor distribution box configuration and its approved interface documents.<\/p>\n\n\n\n<figure class=\"wp-block-image aligncenter size-full\"><img decoding=\"async\" width=\"800\" height=\"600\" src=\"https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/Power-distribution-box-1.jpg\" alt=\"Power Distribution Box range illustrating alternative equipment layouts\" class=\"wp-image-212\" srcset=\"https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/Power-distribution-box-1.jpg 800w, https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/Power-distribution-box-1-300x225.jpg 300w, https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/Power-distribution-box-1-768x576.jpg 768w, https:\/\/dfdl.cc\/wp-content\/uploads\/2026\/07\/Power-distribution-box-1-600x450.jpg 600w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"9-compare-the-proposal-with-the-required-evidence\">9. Compare the proposal with the required evidence<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Build the comparison around commissioning boundaries, then check the related interfaces. For outdoor distribution box, the relevant boundaries include incoming supply and protective device; outgoing circuit schedule; neutral and protective conductor arrangement; mounting and cable entry; required transfer or metering functions. Put the requirement and supplier response in adjacent columns so that differences are visible before purchase.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pay particular attention to a crowded final-circuit layout with insufficient termination space. Require the approved circuit schedule, assembly ratings, enclosure details and routine verification records. If a supplier proposes an alternative, ask which drawings, ratings, accessories and acceptance steps change. The commercial saving should be evaluated with those effects included.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Review item<\/th><th>Incomplete basis<\/th><th>Useful approval evidence<\/th><\/tr><\/thead><tbody><tr><td>Commissioning Boundaries<\/td><td>A product-family name or an unchecked assumption<\/td><td>A documented basis to separate factory checks from site acceptance responsibilities<\/td><\/tr><tr><td>Operating duty<\/td><td>A headline current or voltage without context<\/td><td>A duty schedule covering the approved operating cases<\/td><\/tr><tr><td>Interfaces<\/td><td>Symbols without cable, control or civil details<\/td><td>incoming supply and protective device; outgoing circuit schedule; neutral and protective conductor arrangement; mounting and cable entry; required transfer or metering functions<\/td><\/tr><tr><td>Verification<\/td><td>Unrelated certificates or a similar product demonstration<\/td><td>the approved circuit schedule, assembly ratings, enclosure details and routine verification records<\/td><\/tr><tr><td>Change control<\/td><td>An email substitution with no impact review<\/td><td>An approved revision and identified consequences<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"10-work-through-a-project-review-before-release\">10. Work through a project review before release<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Consider a commercial building refurbishment purchasing outdoor distribution box. The buyer receives two offers that appear to cover the same requirement. Offer A identifies the proposed outdoor distribution box configuration and supplies the supporting interface schedule. Offer B lists a broad series name and leaves the assumptions open. These are illustrative offers, with no invented prices or performance results.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The first review action is to establish the circuit survey and the occupied-building work constraints. The second is to ask both bidders how they will separate factory checks from site acceptance responsibilities. Use the same technical questions for both offers. Any difference in test evidence and configuration traceability or protection settings register should be referred to the responsible designer rather than resolved by choosing the lower commercial total.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Before approving the outdoor distribution box order, close the unresolved interface questions and record the selected configuration. Identify what remains dependent on site work and who will verify it. If the requirement changes, reopen the affected assessment. This creates a practical release decision that the receiving and commissioning teams can understand.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"11-prepare-the-inquiry-and-acceptance-package\">11. Prepare the inquiry and acceptance package<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Send the system diagram, load or feeder information, installation conditions and the specific commissioning boundaries requirement with the inquiry. For outdoor distribution box, also include the relevant cable or control interfaces and the documents required at handover. State quantities and delivery destination separately from the technical duty.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Dongfang\u2019s <a href=\"https:\/\/dfdl.cc\/ar\/solutions\/low-voltage-distribution-control\/\">Power Distribution Box solution support<\/a> can be used as a starting point for discussing the configuration. Ask for a written response that identifies the proposed supply, deviations, evidence and project responsibilities. Final equipment selection should follow the responsible project designer\u2019s assessment.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For the applicable product-standard context, consult the <a href=\"https:\/\/webstore.iec.ch\/en\/publication\/32338\" target=\"_blank\" rel=\"noopener\">IEC low-voltage assembly verification scope<\/a> and specify the required part and edition with the project team. The reference explains the relevant standard family; it does not certify a particular Dongfang configuration.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"12-request-a-configuration-review\">12. Request a configuration review<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">To discuss commissioning boundaries for your outdoor distribution box, <a href=\"https:\/\/dfdl.cc\/ar\/contact-us\/\">send Dongfang Electric Power your project requirements<\/a>. Include the circuit survey and the occupied-building work constraints, the outdoor distribution box schedule and the unresolved interface questions. Request a configuration-specific technical offer and an evidence list for review before purchase.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"frequently-asked-questions\">Frequently asked questions<\/h2>\n\n\n<div id=\"rank-math-faq\" class=\"rank-math-block\">\n<div class=\"rank-math-list\">\n<div id=\"faq-014-1\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">What information is needed to review commissioning boundaries for the outdoor distribution box?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Provide the circuit survey and the occupied-building work constraints, the approved system diagram and the relevant operating conditions. The review should establish how to separate factory checks from site acceptance responsibilities, then confirm the offered configuration and the acceptance evidence.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-014-2\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Does the ZX product name establish every required rating?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>No. State the exposure, mounting location and auxiliary supply needs. Ask for the enclosure declaration applicable to the offered layout rather than assume a particular IP level from the outdoor designation. The supplied outdoor distribution box needs a controlled technical schedule tied to the actual configuration. A catalogue range or keyword does not confirm every optional function.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-014-3\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">Which interfaces need checking before ordering the outdoor distribution box?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Review incoming supply and protective device; outgoing circuit schedule; neutral and protective conductor arrangement; mounting and cable entry; required transfer or metering functions. Assign responsibility for each boundary and keep the supplier response aligned with the approved drawings. Unresolved interfaces should remain visible in the review register.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-014-4\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">How should alternative outdoor distribution box offers be compared?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Use the same requirement schedule and ask each bidder for deviations, scope boundaries and evidence. For this decision, compare commissioning boundaries with test evidence and configuration traceability and protection settings register so that a price difference does not hide a configuration difference.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-014-5\" class=\"rank-math-list-item\">\n<h3 class=\"rank-math-question\">What records should accompany the outdoor distribution box handover?<\/h3>\n<div class=\"rank-math-answer\">\n\n<p>Retain the approved circuit schedule, assembly ratings, enclosure details and routine verification records, the final drawings, asset identifiers and applicable operating information. Keep factory verification distinct from site acceptance and close open technical items through documented review.<\/p>\n\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n\n<div class='fluentform ff-default fluentform_wrapper_3 ffs_default_wrap'><form data-form_id=\"3\" id=\"fluentform_3\" class=\"frm-fluent-form fluent_form_3 ff-el-form-top ff_form_instance_3_1 ff-form-loading ffs_default\" data-form_instance=\"ff_form_instance_3_1\" method=\"POST\" action=\"\" ><fieldset  style=\"border: none!important;margin: 0!important;padding: 0!important;background-color: transparent!important;box-shadow: none!important;outline: none!important; min-inline-size: 100%;\">\n                    <legend class=\"ff_screen_reader_title\" style=\"display: block; margin: 0!important;padding: 0!important;height: 0!important;text-indent: -999999px;width: 0!important;overflow:hidden;\">\u0627\u0644\u0627\u0633\u062a\u0639\u0644\u0627\u0645 \u0639\u0646 \u0627\u0644\u0645\u0648\u0642\u0639<\/legend>        <div\n                style=\"display: none!important; position: absolute!important; transform: translateX(1000%)!important;\"\n                class=\"ff-el-group ff-hpsf-container\"\n        >\n            <div class=\"ff-el-input--label asterisk-right\">\n                <label for=\"ff_3_item_sf\" aria-label=\"\u064a\u0634\u062a\u0631\u0643\">\n                    \u064a\u0634\u062a\u0631\u0643                <\/label>\n            <\/div>\n            <div class=\"ff-el-input--content\">\n                <input type=\"text\"\n                       name=\"item_3__fluent_sf\"\n                       class=\"ff-el-form-control\"\n                       id=\"ff_3_item_sf\"\n                \/>\n            <\/div>\n        <\/div>\n        <input type='hidden' name='__fluent_form_embded_post_id' value='1188' \/><input type=\"hidden\" id=\"_fluentform_3_fluentformnonce\" name=\"_fluentform_3_fluentformnonce\" value=\"9d8d15b745\" \/><input type=\"hidden\" name=\"_wp_http_referer\" value=\"\/ar\/wp-json\/wp\/v2\/posts\/1188\" \/><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_3_input_text' id='label_ff_3_input_text' aria-label=\"\u0627\u0633\u0645\">\u0627\u0633\u0645<\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"input_text\" class=\"ff-el-form-control\" placeholder=\"\u0627\u0633\u0645\" data-name=\"input_text\" id=\"ff_3_input_text\"  aria-invalid=\"false\" aria-required=\"true\"><\/div><\/div><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_3_email' id='label_ff_3_email' aria-label=\"\u0628\u0631\u064a\u062f \u0625\u0644\u0643\u062a\u0631\u0648\u0646\u064a\">\u0628\u0631\u064a\u062f \u0625\u0644\u0643\u062a\u0631\u0648\u0646\u064a<\/label><\/div><div class='ff-el-input--content'><input type=\"email\" name=\"email\" id=\"ff_3_email\" class=\"ff-el-form-control\" placeholder=\"\u0639\u0646\u0648\u0627\u0646 \u0627\u0644\u0628\u0631\u064a\u062f \u0627\u0644\u0625\u0644\u0643\u062a\u0631\u0648\u0646\u064a\" data-name=\"email\"  aria-invalid=\"false\" aria-required=\"true\"><\/div><\/div><div class='ff-el-group'><div class=\"ff-el-input--label ff-el-is-required asterisk-right\"><label for='ff_3_subject' id='label_ff_3_subject' aria-label=\"\u0647\u0627\u062a\u0641\">\u0647\u0627\u062a\u0641<\/label><\/div><div class='ff-el-input--content'><input type=\"text\" name=\"subject\" class=\"ff-el-form-control\" placeholder=\"\u0647\u0627\u062a\u0641\" data-name=\"subject\" id=\"ff_3_subject\"  aria-invalid=\"false\" aria-required=\"true\"><\/div><\/div><div class='ff-el-group'><div class=\"ff-el-input--label asterisk-right\"><label for='ff_3_message' id='label_ff_3_message' aria-label=\"\u0631\u0633\u0627\u0644\u062a\u0643\">\u0631\u0633\u0627\u0644\u062a\u0643<\/label><\/div><div class='ff-el-input--content'><textarea aria-required=\"false\" aria-labelledby=\"label_ff_3_message\" name=\"message\" id=\"ff_3_message\" class=\"ff-el-form-control\" placeholder=\"\u0631\u0633\u0627\u0644\u062a\u0643\" rows=\"5\" cols=\"2\" data-name=\"message\" ><\/textarea><\/div><\/div><div class='ff-el-group ff-text-left ff_submit_btn_wrapper'><button type=\"submit\" class=\"ff-btn ff-btn-submit ff-btn-md ff_btn_style\"  aria-label=\"\u0625\u0631\u0633\u0627\u0644 \u0627\u0644\u0646\u0645\u0648\u0630\u062c\">\u0625\u0631\u0633\u0627\u0644 \u0627\u0644\u0646\u0645\u0648\u0630\u062c<\/button><\/div><\/fieldset><input type=\"hidden\" name=\"trp-form-language\" value=\"ar\"\/><\/form><div id='fluentform_3_errors' class='ff-errors-in-stack ff_form_instance_3_1 ff-form-loading_errors ff_form_instance_3_1_errors'><\/div><\/div>            <script type=\"text\/javascript\">\n                window.fluent_form_ff_form_instance_3_1 = {\"id\":\"3\",\"ajaxUrl\":\"https:\\\/\\\/dfdl.cc\\\/wp-admin\\\/admin-ajax.php\",\"settings\":{\"layout\":{\"labelPlacement\":\"top\",\"helpMessagePlacement\":\"with_label\",\"errorMessagePlacement\":\"inline\",\"cssClassName\":\"\",\"asteriskPlacement\":\"asterisk-right\"},\"restrictions\":{\"denyEmptySubmission\":{\"enabled\":false}}},\"form_instance\":\"ff_form_instance_3_1\",\"form_id_selector\":\"fluentform_3\",\"rules\":{\"input_text\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global_message\":\"This field is required\",\"global\":true}},\"email\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global\":false,\"global_message\":\"This field is required\"},\"email\":{\"value\":true,\"message\":\"This field must contain a valid email\",\"global\":false,\"global_message\":\"This field must contain a valid email\"}},\"subject\":{\"required\":{\"value\":true,\"message\":\"This field is required\",\"global\":false,\"global_message\":\"This field is required\"}},\"message\":{\"required\":{\"value\":false,\"message\":\"This field is required\",\"global\":false,\"global_message\":\"This field is required\"}}},\"debounce_time\":300,\"file_upload_settings\":[]};\n                            <\/script>","protected":false},"excerpt":{"rendered":"<p>Outdoor Distribution Box: commissioning boundaries. Review ratings, interfaces and verification before ordering.<\/p>","protected":false},"author":1,"featured_media":731,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","rank_math_title":"Outdoor Distribution Box: Commissioning Boundaries","rank_math_description":"Outdoor Distribution Box: commissioning boundaries. Review ratings, interfaces and verification before ordering.","rank_math_canonical_url":"https:\/\/dfdl.cc\/zx-commissioning-boundaries-procurement-guide\/","rank_math_focus_keyword":"Outdoor Distribution Box"},"categories":[26],"tags":[],"class_list":["post-1188","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/dfdl.cc\/ar\/wp-json\/wp\/v2\/posts\/1188","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dfdl.cc\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dfdl.cc\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dfdl.cc\/ar\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dfdl.cc\/ar\/wp-json\/wp\/v2\/comments?post=1188"}],"version-history":[{"count":1,"href":"https:\/\/dfdl.cc\/ar\/wp-json\/wp\/v2\/posts\/1188\/revisions"}],"predecessor-version":[{"id":1650,"href":"https:\/\/dfdl.cc\/ar\/wp-json\/wp\/v2\/posts\/1188\/revisions\/1650"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dfdl.cc\/ar\/wp-json\/wp\/v2\/media\/731"}],"wp:attachment":[{"href":"https:\/\/dfdl.cc\/ar\/wp-json\/wp\/v2\/media?parent=1188"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dfdl.cc\/ar\/wp-json\/wp\/v2\/categories?post=1188"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dfdl.cc\/ar\/wp-json\/wp\/v2\/tags?post=1188"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}